Cured-In-Place-Pipelining Demonstration Days July 18 – 19

Jul 18

Cured-In-Place-Pipelining Demonstration Days July 18 – 19

Perma-Liner Industries, LLC. to Hold Live Cured-In-Place-Pipelining Demonstration Days and Educational Sessions Open House will be held in Anaheim, Cali. on July 18 – 19 ANAHEIM, Cali. – With state-of-the-art technology options, it is not necessary to dig up aging or failing pipes to repair them. There is an efficient and cost-effective way to repair these...

Read More

Epoxy vinyl ester resin brings many advantages to CIPP industry

Jul 09

Epoxy vinyl ester resin brings many advantages to CIPP industry

Perma-Liner™ Industries, LLC. (“Perma-Liner”), the leading manufacturer and supplier of trenchless pipeline rehabilitation equipment and materials in North America, is introducing a new high-performance epoxy vinyl ester resin called Perma-Liner™ Vinyl Ester. The resin is Bisphenol-A Epoxy-based dissolved in styrene and is available now for purchase. “We...

Read More

America’s Failing Water Infrastructure: There are Ways We Can Begin to Fix It

Jun 06

America’s Failing Water Infrastructure: There are Ways We Can Begin to Fix It

There are many variables threatening America’s water from pollution issues and aging infrastructure to raising costs and droughts and rainfall patterns as the climate changes. The U.S. used to be a leader when it came to water infrastructure and management. Now, the U.S. is lagging behind receiving D ratings for dams, drinking water and wastewater. It’s time to...

Read More

Assessing Sewer Line Leads to Greasy Discovery

Feb 29

Assessing Sewer Line Leads to Greasy Discovery

Livonia is a well-planned community of residential, industrial, commercial and civic development with a population of approximately 100,000. Centrally located between Detroit and Ann Arbor at the intersection of two major freeways — I-96, which travels east and west, and I-275, which travels north and south — beneficial and convenient to those travelling in and...

Read More

Michigan Avenue Blue Sewer Liner Project

Sep 11

Michigan Avenue Blue Sewer Liner Project

Due to a collapse earlier this summer of a deteriorated pipeline, the City of Adrian solved a future problem before it happened.  This project was, in effect, considered an emergency repair.  The thickness of the pipeline in question had downgraded to approximately 3/8 of an inch from where it started at 2.5 inches.  The line that was repaired was replaced using...

Read More