Bloomfield Village is a scenic, tree-lined and aesthetically pleasing area within the Bloomfield Township. The residential neighborhood has approximately1000 homes and was established in 1924. Recently, the town decided to replace the water main which required a method called prechlorinated pipe bursting. This decision was made due to limited space along right of ways in the village and the concern for traffic disruption. Originally, a method devised in Europe, the prechlorinated pipe bursting technique was first introduced in the U.S. for a Florida Municipal water main replacement project in 2000. This process can take up to two days. Portions of Bloomfield village’s water system range in age from 47 to 90 years old. The newest sections of the 11 miles of ductile iron pipe were installed in 1968. The enhancement project’s main objective is to replace aging and undersized water mains and replace and add water system valves for more reliable water system operation.
While pipe bursting requires relatively small excavations, Perma-Liner Industries has been a leader in manufacturing trenchless pipeline rehabilitation equipment since 1999. It is considered the least invasive method, as well as, the most user friendly of systems for existing sewer systems. The whole process takes hours as opposed to days. Our experience in the CIPP (Cured in Place Pipe) industry had allowed us to design and patent state of the art equipment and materials. Perma-Liner Industries is also pleased to introduce our profit making powerhouse in our inventory. It’s a 22 foot Perma-Main™ Top Gun Trailer system. Training is included with this package deal and it’s our best ‘turn-key’ solution we have for you to replace a conventional dig. This impressive system can rehabilitate 6”-10” diameter pipelines. It also comes with a zero down, no payment for 90 days offer. Call us or go online to find out more. 1-866-336-2568 or www.perma-liner.com