Waterline Renewal Technologies

SLB Pipe Solutions completed a pipelining job using Perma-Liner equipment

SLB Pipe Solutions completed a pipelining job using Perma-Liner equipment

SLB Pipe Solutions completed a pipelining job using Perma-Liner equipment and materials on a large diameter sprinkler supply line at a Honda plant. They had multiple longitudinal cracks 15 feet under a new $4 million reinforced concrete delivery road that was just poured. They were losing approximately 200 gpm and had the pumps working almost non stop.  The access to the pipe was inside the delivery bay of the American Honda plant, that was an 8″ pipe with 3 – 90 degree bends and went for 25′ until it transitioned to 10″. Due to the access pipe being 24″ off the floor running vertically, and the length of the pipe to be lined we had to use a scissor lift and 15 feet of delivery hose to fit the material into the inverter.  The inversion went flawlessly and the customer has not had any more issues with the supply line.  If you live in or near the Detroit area, and have pipelining needs please contact 866-336-2568. Perma-Liner will be providing P demonstrations at our Corporate Headquarters March 25th – 27th.

SLB Pipe Solutions completed a pipelining job using Perma-Liner equipment
SLB Pipe Solutions completed a pipelining job using Perma-Liner equipment
Waterline Renewal Technologies
Waterline Renewal Technologies